This month we completed a large-scale asbestos roof removal and replacement in Abbotsford. Two of ACR Roofing’s long-term supervisors, Quentin Klenner and Leighton Boltwin, oversaw the replacement of 2,000m² of roof at the Factory X site. The site was comprised of two separate, quite different roof profiles: a saw-tooth roof and a two-storey roof, which were both replaced with Colorbond. As always, our crew worked carefully to remove, and safely dispose of, all the asbestos material found on-site. Then, we laid two new, completely watertight roofs, working around a number of existing obstacles, including skylights and lift-shafts.