Olinda Kinder Springvale
This metal roof replacement was under strict timelines and had to be completed during the Easter holidays. This project was approximately 350m2 of flat deck, and the replacement was with the usual Plain Zincalume deck roof sheeting, along with skylights, and perimeter cappings. The completed roof installation is fantastic, and our business relationship with Campeyn Group continues.